top of page

Chalk Bluffs Wind Project — Information from the Recent Open House

16 hours ago
2 min read

Earlier this month, I attended an open house at LCCC on the proposed Chalk Bluffs wind energy project along the Wyoming-Colorado border. I wanted to share what I learned with those who couldn't attend.


The meeting was a little different from a traditional public presentation. The developer set up informational boards throughout two rooms, with representatives available to answer questions about different aspects of the project. This allowed attendees to meet directly with the people involved and focus on the issues that concerned them most.


According to company representatives, the project has been reduced in size, several turbine locations have changed, and setbacks have increased. They also discussed moving a proposed transmission route away from Horse Creek toward Bear Creek. These changes deserve close review, especially to understand how they affect neighboring properties and the people living closest to the proposed development.


I spent time visiting with the project's wildlife biologist, who explained that the project has conducted about three years of wildlife studies. According to the biologist, those studies influenced turbine locations around sensitive wildlife areas, including nesting and burrowing sites. The company also described technology designed to detect approaching birds and automatically stop turbines until the birds have passed. I found that interesting, and I'd like to know more about how well it works under actual operating conditions.


Other subjects included turbine noise, shadow flicker, construction traffic, water use, and the potential effects on surrounding properties. The developer outlined measures intended to address these concerns, but understanding how effective those measures will be remains just as important as knowing what is being proposed.


The county’s review process will also address potential impacts to county roads during construction, responsibility for repairs, and financial assurances for eventual turbine removal. These considerations matter when evaluating the project's long-term responsibilities.


Projects like this can bring economic benefits, including tax revenue and construction activity. They also raise legitimate concerns about neighboring properties, wildlife, infrastructure, and the landscape. Both deserve consideration.


I want to emphasize that much of the information shared at the open house came from the developer. I'm sharing it so residents know what is being proposed and what changes the company says it has made, not because those claims or proposed protections have all been independently verified.


As the project moves through the county's review process, you’ll have opportunities to examine the information more closely and hear from affected residents. Whether you support the project, oppose it, or haven't made up your mind, please stay involved, ask questions, and make your voice heard.

Additional information provided by the developer can be found at:


Help Elect Don!

Consider donating or helping with the campaign

SUBSCRIBE TO OUR NEWSLETTER

Get the latest updates
from Don's desk

Thanks for submitting!

Don Hollingshead

LARAMIE

COUNTY COMMISSIONER

  • Facebook
  • Instagram
  • Youtube

© 2023 by Don Hollingshead. Powered and secured by Wix

Paid for by the Committee to Elect Hollingshead for Commissioner


HollingsheadForCommissioner@gmail.com

307-640-9868

​

Cheyenne, WY 82009

bottom of page